Basement to Accessory Dwelling Unit : How Much Time Will the Conversion Require?

The length for converting your lower level into an ADU can differ considerably, typically ranging from approximately 8 to 20 weeks , but potentially extending longer depending on more info multiple factors. These include the existing condition of the basement, the scope of the project (e.g., adding a washroom , kitchen ), necessary permitting proce

read more